Preparation before installing the paper cup machine

Sep 12, 2024

Leave a message

1. Site planning: According to the size, weight and operation requirements of the paper cup machine, reasonably plan the installation location to ensure that the site is flat and well ventilated, and reserve sufficient space for operation and maintenance.

2. Foundation construction: According to the equipment requirements, pour or reinforce the foundation to ensure that the equipment is stable and does not shake.

3. Power supply and gas source preparation: Check and connect the power supply and gas source that meet the requirements to ensure stable voltage and sufficient air pressure.

4. Tool and material preparation: Prepare necessary installation tools (such as screwdrivers, wrenches, jacks, etc.), auxiliary materials (such as gaskets, screws, lubricating oil, etc.) and safety protection supplies.

5. Personnel training: Provide safety education and technical training to technicians involved in the installation to ensure that they are familiar with the installation process and operating specifications.